Waste Water Treatment Plant in the city of Kropyvnytskyi with a capacity of 33 000,00 m3 per day were reconstructed as part of the Second Urban Infrastructure Development Project with support from the World Bank.
Productivity is 33,000m3/day.
Classical purification scheme using the latest equipment.
Mechanical purification:
-
Purification of water on channel grates from solid inclusions.
-
Purification of water from sand in sand traps.
-
Water settling in primary settling tanks.
Biological purification:
-
Water purification in biological reactors with internal recycle.
-
Sludge separation in secondary settling tanks.
-
Disinfection of purified water with sodium hypochlorite.
-
Dewatering of excess sludge and raw sediment in centrifuges.
The facility was successfully completed and put into operation in 2024.