Reconstruction of water supply networks in the city of Zhytomyr is underway as part of the Second Urban Infrastructure Development Project with support from the World Bank.
Within the framework of the Contract in the city of Zhytomyr, polyethylene pipes with a diameter of Ø1000 mm are currently being laid to provide a modern drainage system for the entire population of the city.